PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Welding moment connections at Derrick -3 (3rd Floor) Facing North (800x600).jpg Welding moment connections at Derrick -3 (3rd Floor) Facing South (800x600).jpg Working on the Sprinkler Room piping Facing East (800x600).jpg Backfilling and compacting at Rahway Ave. Facing the Administration Building (800x600).jpg Continued installing the metal stairs at Stair -5 Facing West (800x600).jpg Excavating at Rahway Ave. past the Bridge Facing the New Court Building (800x600).jpg Finished installing the shear wall panels at Elev. 5,6 (4th Floor) Facing West (800x600).jpg Installing bearing plate boxes at Elev. 4-Stair -2 (4th Floor) Facing South-West (800x600).jpg Piping at the Sprinkler room Facing South-East (800x600).jpg
Previous pageNext page Continued installing the metal stairs at Stair -5 Facing West (800x600)
Continued installing the metal stairs at Stair -5 Facing West (800x600)